• This is the beta version of CII Market Place website. Give feedback to help us improve it.

Pipe Galvanizing Plant

By NIRMAL OVERSEAS PVT LTD
PRE – TREATMENT PROCESS of Pipe Galvanizing Plant

1. PICKLING UNIT
ACID FUME SUCTION ARRANGEMENT
THE SECTION OF FUME FROM THE PICKLING TANKS WILL BE THROUGH A CENTRAL DUCT TO OUTSIDE THROUGH A FRP LINED CENTRIFUGAL FAN, THE CHIMNEY WILL BE FIBRE LINED. AIR BLOWING IS PROVIDED AT THE TOP OF TANKS.

2. ROCKING ARM ARRANGEMENT

ROCKING ARM IS TO BE FITTED FOR ACID FUME TANKS. ALL THE ARRANGEMENT TO BE MADE FOR FINE ACCURACY & CLEANING OF THE PIPES. WHEN THE PIPE BUNDLE IS TO BE FEED IN ACID TANK AT THAT TIME LINER MOVEMENT IS REQUIRE FOR THE PIPES. SO THAT ACID IS TO BE CIRCULATED IN ALL DIRECTION OF PIPE INSIDE & OUTSIDE SURFACE OF THE PIPE. THE ARRANGEMENT IS MADE TO ROTATE THE PIPE IN HIGH DIRECTION & CLEANING IS MADE FOR THE EFFECTIVE GALVANISING.

3. WATER RINSE TANK 

THERE WILL BE 2 WATER RINSING TANK ONE TO WORK AS COLD WASH AND OTHER HOT WASHING. THESE TANKS ALSO MADE OF STEEL WITH GLASS FIBRE LINING.

6. DRIP TRAY

THE FLUX PIPE WILL BE PUT ON THIS DRIP TRAY SO THAT INTO SMALL DROPLS OF FLUX IN THE PIPE ARE DRAINED THE FLUX TANK. (ALL THESE TANKS WILL BE PROVIDED WITH SUITABLE DRAINS, OVERFLOW CONNECTION ETC) 

7. GALVANIZING
Show More Show Less
Product Description
PRE – TREATMENT PROCESS of Pipe Galvanizing Plant

1. PICKLING UNIT
ACID FUME SUCTION ARRANGEMENT
THE SECTION OF FUME FROM THE PICKLING TANKS WILL BE THROUGH A CENTRAL DUCT TO OUTSIDE THROUGH A FRP LINED CENTRIFUGAL FAN, THE CHIMNEY WILL BE FIBRE LINED. AIR BLOWING IS PROVIDED AT THE TOP OF TANKS.

2. ROCKING ARM ARRANGEMENT

ROCKING ARM IS TO BE FITTED FOR ACID FUME TANKS. ALL THE ARRANGEMENT TO BE MADE FOR FINE ACCURACY & CLEANING OF THE PIPES. WHEN THE PIPE BUNDLE IS TO BE FEED IN ACID TANK AT THAT TIME LINER MOVEMENT IS REQUIRE FOR THE PIPES. SO THAT ACID IS TO BE CIRCULATED IN ALL DIRECTION OF PIPE INSIDE & OUTSIDE SURFACE OF THE PIPE. THE ARRANGEMENT IS MADE TO ROTATE THE PIPE IN HIGH DIRECTION & CLEANING IS MADE FOR THE EFFECTIVE GALVANISING.

3. WATER RINSE TANK 

THERE WILL BE 2 WATER RINSING TANK ONE TO WORK AS COLD WASH AND OTHER HOT WASHING. THESE TANKS ALSO MADE OF STEEL WITH GLASS FIBRE LINING.

6. DRIP TRAY

THE FLUX PIPE WILL BE PUT ON THIS DRIP TRAY SO THAT INTO SMALL DROPLS OF FLUX IN THE PIPE ARE DRAINED THE FLUX TANK. (ALL THESE TANKS WILL BE PROVIDED WITH SUITABLE DRAINS, OVERFLOW CONNECTION ETC) 

7. GALVANIZING